Click here to download or print this document as a PDF.
MIL CONTRACT FLOW-DOWN (Rev. B)
To avoid delays in processing, please utilize the following list for PO flow-down requirements. *Red denotes change
| Required Purchase Order Items Purchase order number Engineering drawing and revision Parts list or Bill of Materials Material type/condition/hardness Process specification and revision Shipping instructions ECO’s/ECN’s | Required Items when Applicable DOD Ratings Aircraft model number/destination (Boeing) Bell Helicopter purchase order number Flight Safety parts/Frozen Planning MIL Quote Number |
*Drawings are critical when there is a dimensional change/requirement in processing. They also enable MIL to assess our approval status with the design authority, as well as defining protocols for handling, racking, inspections, masking, etc. It is vital that you include a drawing with your purchase order for us to appropriately process your parts.
*Please specify any other reference items you would like included on the certification, such as customer job number, heat lot, serial numbers, etc.
*Parts may be subject to additional specification requirements in addition to the processes directly referenced on the quote (i.e. 7 to 14 day coatings cure, process qualification tests).
*Please note that a non-stock material charge may be required for any coatings or chemistry requirements outside of our internal stock or chemistry.
*Unless otherwise specified, the design authority on the customer supplied engineering drawing shall be used to determine end-user approval status.
*There will be a $5 per box handling charge for all Fed-Ex/UPS shipments. Any special packaging will require additional charges.
*No charge for hazardous waste or certification, however, if customer requires deviation from original certification, an additional charge of $50 may apply.
Thank you for your time,
MIL Customer Service and Sales Team
Return to our Home page.