
siding is peeled off from existing building

precast wall panels are erected



support beams are lowered into place



![]() |
![]() |
![]() |
|
|
|
![]()
|
![]()
![]()
![]()
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
![]() |
|
|
© 2005 MAGNETIC INSPECTION LABORATORY, INC |
|
|
|
developed by americaneagle.com |
![]() |